Mature Scrum


This is a follow-up post to Dinner with Jeff Sutherland, where Jeff talked about Systematic and the two LEAN metrics for driving improvements; 1) Process Efficiency, and 2) Fix time after failed builds. More details are now available in a paper titled Mature Scrum at Systematic.

Systematic combined a LEAN operating model, SCRUM as the project management framework allowing for flexibility and adaptability, and CMMI to institutionalize these elements into the culture of the organization, driving discipline and measurability. More information as well on how User Stories are prepared to a READY-READY state before being allowed to enter the Sprint. The grooming of the backlog and preparing User Stories is done in parallel to the Sprint.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s